Newsletter

Five minutes. What happened, and what to do about it.

AI data centres could leave a mountain of e-waste, report warns

The Register· 19 Sep

The Basel Action Network estimates AI infrastructure could produce 395 to 617 million tonnes of e-waste from 2025 to 2050, enough shipping containers to circle the Earth about six times. It says past estimates counted servers and accelerators, only 13% of a data centre's equipment by weight, and missed power, cooling and networking gear.

  • When you choose an AI or cloud provider, ask what it does with retired hardware.
  • Keep your own equipment in use for longer, and recycle it through a certified scheme when it is done.

Source: The Register. This is our short summary of their reporting. The commentary in it and the things to do are SeedFoundry's opinion. Picture from the source, unless it is our own graphic. How we source and credit

That is sat 19 sep, all of it.

These are short summaries of other people's reporting, with our own commentary. Each story names its source and links to the original. How we source and credit